Comparing methods and the crossover

Compare two methods at different input sizes and find where one overtakes the other.

  • 50 minutes
  • Serves O5
  • Assumes M5.L2

Phase 1: Prepare

Step 1 Warm-up recall

From M5.L2: doubling n for a quadratic method?

Private: nothing you type here is sent or stored.

Step 2 Learning goal

By the end of this lesson you can:

  • compute the cost of two methods at the same n (Foundation);
  • find a crossover point (Core);
  • choose a method for a stated workload (Core).

Phase 2: Teach

Step 3 A familiar example

A method with a heavy set-up but slow growth loses on tiny inputs and wins on large ones. Growth rate decides which in the end, but your actual input size decides which today.

Step 4 Clear explanation

Two methods can be compared by computing their step counts at the same input size. Take two invented methods: method A costs 100 × n steps (linear, with a large constant), and method B costs n × n steps (quadratic, with none).

nMethod A: 100 × n stepsMethod B: n × n stepsFewer steps
101,000100B
10010,00010,000Equal
1,000100,0001,000,000A
n = 10: B wins0n = 100: equal1n = 1,000: A wins2Where the lines cross
Invented methods A and B cross over at n = 100: the method with the larger constant wins on long inputs.

For small n, B is cheaper; they are equal at n = 100; beyond that, A is cheaper, and the gap widens. The point where the lines cross is the crossover. To decide, find your expected n. If a task will only ever handle 50 items, B is better today. If it may grow to thousands, choose A. Growth rate wins in the long run, but input size decides in practice. A programmer working in any programming language faces the same choice between a simple method and a scalable one.

Step 5 Worked example (4 marks)

For methods A (100 × n) and B (n × n), which is cheaper at n = 500 and by how much?

  1. A: 100 × 500 = 50,000. (1 mark)
  2. B: 500 × 500 = 250,000. (1 mark)
  3. A is cheaper. (1 mark)
  4. Answer: A, by 200,000 steps. (1 mark)

Phase 3: Practise

Step 6 Learner practice (instant-marked)

1. The crossover is the input size at which:

2. For A = 100n and B = n×n, at n = 10 the cheaper is:

3. For A = 100n and B = n×n, at n = 1,000 the cheaper is:

4. A task will only ever handle 50 items. Which is cheaper?

Phase 4: Close

Step 7 Recap

  • Compute both costs at your expected n.
  • The crossover is where the methods cost the same.
  • Growth wins in the long run; input size decides today.

Step 8 Exit ticket (ungraded)

Find the cost of A and B at n = 20 and say which is cheaper.

Private: nothing you type here is sent or stored.

Step 9 Go further (Extension)

Describe a task whose input may grow and say why you would choose the slower-growing method.

Common mistakes

MistakeWhy it fails
Choosing on growth aloneCheck the input size you really expect.
Comparing at different nUse the same n for both methods.
Ignoring the constant factorA large constant shifts the crossover.

Limits. Methods A and B are invented for illustration; real constants must be measured.